planning blog
props- Since i will be doing a skincare headband commercial, the main prop will be the headband. I will also include water, a sink, and a foaming face cleanser. Those are all objects I use when doing my skincare. I will maybe even add a face mask, but i am still not sure yet.
costumes- I will be wearing just a regular t-shirt and pant that will serve as pajamas. In the first few shots i will have my hair loose. Then, in the other half of the commercial my hair will be pulled back by the headband. I will also be wearing house slippers.
schedule-
On September 27, I will be researching on specific factors inside of headband commercials.
On September 29 I will be establishing my props, costumes, location list, and backup plan.
On October 1, i will be creating my storyboard.
On October 5, i will start the recording of my commercial.
On October 10, I will finish up the last touches of the commercial and edit it.
location list- The main location will the bathroom because that's where the headband is usually more in use. Then the second location would be my bedroom because I was thinking of doing a scene of me grabbing the headband from my bedroom. Also, in the end I wanted to add a scene of me relaxing in the bedroom wearing the headband while having a facial mask on. The hallway between my room and bathroom could also be considered another setting since there will be a small shot there.
backup plan- If the hurricane that is incoming destroys my house I will probably have to film my commercial in a hotel I would be staying at in the meantime. If my legs gets injured then i will have another actor take my place. Lastly, if the hurricane takes me out i guess it will be all over the commercial just won't get done.
Comments
Post a Comment